--
medium farm horsepower tractor, front loader and hoe, powerful engine
tractor front with loader is a professional production of pastoral management machine, is the collection many long, developed a new type of agricultural machinery products, the product performance, excellent quality, simple operation, form a complete set of machinery to be complete, the applicable scope is wide, into the orchard, greenhouses, terrace and sloping area in operation as well as in cotton, corn, grapes, tea, tobacco, seedlings of economic crops, such as cultivating, scarification, weeding, etc. Plant ginger, produce ginger, potato dig, can more play, unique place, its volume is small, the power is big, the use is extensive, have other similar product the superiority that cannot be replaced.
Model | GWW-704A | ||
Wheeled Type | 4×4 | ||
Dimensions (mm) | Tread | Front Wheel | 1250 |
Rear Wheel | 1300 | ||
Wheel Base | 2010 | ||
Min. Ground Base | 325 | ||
Min. Usage Mass(kg) | 2160 | ||
Engine | Model | A4K43T70A | |
Type | Vertical, Water Cooled and 4-Stroke | ||
Rated Power (kw) | 51.5 | ||
Rated Rev. (r/min) | 2300 | ||
Fuel | Diesel | ||
Tire | Front Wheel | 8.3-20 | |
Rear Wheel | 12.4-28 | ||
Clutch | Dry-Friction, Single Disc and Dual-Stage | ||
Steering | Hydraulic | ||
Transmission Box | (4+1)×2 | ||
PTO | Type | Rear Mounted, Semi-Independent | |
Rated Rev.(r/min) | 540/1000 | ||
Spline Size | I35 Rectangle Spline with 6 Teeth |
1. Diesel Engine:A4K43T70A
2. Transmission Box: (4+1)×2
3. PTO Speed: 540/1000 r/min
4. Color: Customized
5. Packing: Iron frame, iron crate or customized
Product details
Packaging Mode: Iron frame, iron crate or customized.
Delivery Time: within 30-35 working days after payment.
Description of core advantages:Weifang Binhai Group Work Win Supply Chain Co., Ltd is a leading manufacturer and provider of total integrated supply chain solutions. We offer the best chemical products for the orders.
Company details:Weifang Binhai Group Work Win Supply Chain Co., Ltd is a leading manufacturer and provider of total integrated supply chain solutions. We offer the best chemical products for the orders.
We have a multilingual team, and many big branch factories. A regional market presence-including southeast Asia, Indonesia, Russia, Spain, Chile, Brasil, Australia etc.
Group Work Win strives to build a long term relationships by providing our customers with continuous and reactive support. We aim to supply better quality products and after-sales service.
1. Where is your plant located ?
Binhai Economic Development Area, Weifang City, Shandong Province, China.
2.Which is the loading port?
Qingdao Port, China
3.Can you provide free sample?
Sample is free. The shipping charges should be paid by the buyer.
4.What's your payment terms?
T/T or L/C.
5. What documents you provide?
Usually, we provide Commerical Invoice, Packing List, Bill of loading, COA , Health certificate and Origin certificate. If your markets have any special requirements, let us know.